Hi All
Well, what a busy time of year this is turning out to be! As you may know, I have spent the last 5 years in a windowless dungeon that barely fits the Heresy stuff inside. Well, since bringing the resin casting side of things into play, I have been very much overcrowded in here. My resin casting room is a desk 6 feet long, you can't move for boxes and detritus and it just isn't cutting the mustard. Add in a super-dodgy landlord and general poor state of repair of the yard the unit is in, and it all adds up to being bad for general business.
And now, the Kickstarter has been wildly successful, and it means that I absolutely must have more space to make all the new moulds for all the monsters! My current workshop's contract runs out on 24th September, and thanks to the last minute splurge of funds I can finally afford somewhere bigger, so I've put an offer in on a new workshop on the other side of town. Assuming my offer is accepted, it means a frantic two weeks of packing everything up ready to load into a big van (and taking half of it to the recycling centre probably) and at least a month between packing everything this end and being set up enough to do the orders at the other end, so I'll be forced to close the Heresy shop for the duration as otherwise there will be too big a queue of orders built up.
If you want something between now and end of October (hopefully I'll be set up for packing/shipping before then, but just in case let's say that date) you will need to order it in the next 48 hours as I'll be too busy to cope at that point and will switch the shop to Showcase mode, where you can look but not buy, until such time as I can process things again at the new workshop. (Again, this all depends on my offer being accepted but big warning klaxons are going off right now just in case)